Case study

A fan activation that had to survive being genuinely popular

A sports governing body ran an LED and camera activation at a stadium concourse. It was sized for 900 participants a day and saw 2,400 on the first, without a queue-management failure.

A large LED wall photographed from a steep angle so the panel seams and mounting frame read as texture.
2,400Participants, day one
38sPer participant, sustained
94%Chose to share their clip

The challenge

What was actually wrong

Concourse activations fail in one of two ways: nobody uses them, or so many people use them that the queue blocks a circulation route, which is a safety issue rather than an inconvenience. The brief assumed 900 a day and the concourse had a hard limit on standing queue length.

Approach

How we sized it

We designed for the overload case from the start. The interaction was capped at a fixed duration rather than allowed to run long, delivery was by link rather than at the unit, and the queue had a defined cut point with a steward brief for what to do when it was reached.

Deployment

What went on the floor

A single LED capture volume with two operators, throughput held at 38 seconds a participant across a nine-hour day. Clips were delivered by QR to the participant's own phone rather than printed or emailed on site, which removed the second queue that normally forms at the collection point.

Results

What we measured

2,400

Participants, day one

38s

Per participant, sustained

94%

Chose to share their clip

Let's build the room

Send us the date, the city and the headcount. We come back with sizing, staffing and a costed range.