Pricing

How pricing actually works

We do not publish a price list, and we would rather explain why than pretend. A 300-delegate single-hall event and a 6,000-delegate four-hall congress share almost nothing. Any single figure covering both would be fiction.

What we can do is tell you exactly what drives the number, and commit to a costed range within three working days of getting four facts.

Engagement models

Three ways to buy

  • Most common

    Event package

    Per event

    Range within 3 working days; fixed after the venue survey

    One conference, one costed scope. Hardware, software, crew and a named floor lead for the show days.

    • Arrival-curve modelling and counter sizing
    • Hardware, consumables and badge stock
    • Venue network survey and dry run
    • Named floor lead with decision authority
    • Post-event report inside five working days
  • Annual retainer

    Per year

    Worth modelling from four events a year

    A standing team and a reserved kit pool across your calendar, with priority on contested show dates.

    • Reserved hardware pool
    • Priority booking on peak dates
    • Shared delegate database across events
    • Quarterly review against your own numbers
    • Discounted per-event rate
  • Build

    Fixed scope or T&M

    ZebIQ Technology engagement

    Software, AI or infrastructure work delivered by the engineering division. You own the code and the pipeline.

    • Discovery and technical architecture
    • Repository and deploy pipeline handover
    • Documented runbook plus a handover session
    • Optional managed support with named engineers

Cost drivers

What moves the number

In rough order of impact. If you want to reduce cost, the top three are where the leverage is — not the technology choices.

Lead time is the one people underestimate. Three weeks or less removes options rather than just adding urgency.
Delegate countPrimary driverSets counters, badge stock and crew size
Show daysLinearCrew and kit are day-rated
Halls needing access controlStep changeEach controlled door adds a portal and a briefed person
Hardware supplied byUs or youUsing your kit reduces cost and shifts failure risk to you
LanguagesMain driver on translationBeyond 8 targets a second GPU node is required
CityLogistics onlyAffects freight and crew travel, not the technology
Lead timeInverseUnder three weeks removes cheaper options like pre-printed stock
Lead time is the one people underestimate. Three weeks or less removes options rather than just adding urgency.

How we quote

A range first, a fixed figure after the survey

Send four facts — date, city, headcount, number of halls — and we return an indicative range within three working days. That range is honest about its own uncertainty and usually spans about 25%.

The fixed figure comes after the venue survey, because a survey routinely changes the answer. On one recent 900-delegate summit it removed two counters and reduced the quote. On another it found a shared uplink that added a bonded 4G line.

We do not charge for the survey on an event we are quoting.

Get a costed range

Four facts, three working days, a real number with its assumptions written down.